JLG 660SJ Service And Maintenance Manual page 236

Hide thumbs Also See for 660SJ:
Table of Contents

Advertisement

SECTION 5 - HYDRAULICS
13. Gently slide gear housing over rear bearing block
assembly. Slide housing down until it engages dowel
pins. Press firmly in place with hands, do not force or use
any tool. Check intake port in housing is on same side as
open end of E-seal, and marked lines on mounting
flange and gear housing are aligned.
NOTE: Rear bearing block surface should be slightly below gear
housing face. If bearing block is higher than rear face of
gear housing, E-seal or O-ring have shifted out of groove.
Remove gear housing and check for proper seal installa-
tion.
14. Install two remaining dowel pins in rear of gear housing,
if applicable. Place end cover over back of pump.
5-44
15. Install four spacers (if applicable) and hex head bolts
through bolt holes in end cover. Hand tighten.
16. Place mounting flange of pump in protected jawed vise
and alternately torque bolts to torque chart specifica-
tions. All torque figures are for "dry torque" bolts.
Table 5-1.Hydraulic Pump Bolt Torque Chart
Pump Series
Thread Size
W-600
M 8 x 1.25
W-900
M 10 x 1.5
W-1500
M 12 x 1.75
17. Remove pump from vise.
18. Place a small amount of clean oil in pump inlet and
rotate drive shaft away from inlet one revolution. If drive
shaft binds, disassemble pump and check for assembly
problems. Reassemble pump.
– JLG Lift –
Torque Values,
Torque Values,
Black Oxide
Zinc Plated End
End Cover
Cover
18-21 ft.lb.
16-18 ft.lb.
24-30 Nm
21.7-24.4 Nm
50-55 ft.lb.
38-43 ft.lb.
68-75 Nm
51.5-58.3 Nm
80-85 ft.lb.
68-73 ft.lb.
108-115 Nm
92.2-99 Nm
3121298

Advertisement

Table of Contents
loading

This manual is also suitable for:

600s

Table of Contents