Promise Technology VTrack M-Class M200f Product Manual page 284

Promise technology vtrak m-class product manual
Table of Contents

Advertisement

VTrak M-Class Product Manual
Event
Host-interface controller
settings have changed
Fibre Channel
Fibre Channel controller
has detected bus reset
Fibre Channel controller
has received a LUN reset
command.
Fibre Channel controller
has encountered a fatal
error
Fibre Channel link is up
Fibre Channel link is
down
Fibre Channel controller
settings have changed
iSCSI
iSCSI link is up
iSCSI link is down
Logical Drive
Logical drive initialization
has started
Logical drive initialization
has completed
Logical drive initialization
has paused
Logical drive initialization
has resumed
Logical drive initialization
has stopped
Logical drive initialization
marks the logical drive
offline
Result of user action. Normal.
The initiator sent a reset command. If this message
appears repeatedly, contact Technical Support. See
page 299.
Result of user action. Normal.
Restart the VTrak. See page 218. If this message
appears repeatedly, contact Technical Support. See
page 299.
FC link connected and ready. Normal.
FC link disconnected or otherwise not working.
Result of user action. Normal.
iSCSI link connected and ready. Normal.
iSCSI link disconnected or otherwise not working.
Result of user action. Normal.
Logical drive is ready to use. Normal.
Initialization paused because of user intervention,
schedule or a higher priority background activity.
Initialization has resumed again after a pause.
Initialization stopped because of user intervention,
schedule or the logical drive was deleted or went
critical or offline.
Initialization failure due to a failed disk drive. Replace
the disk drive, delete and recreate the logical drive.
See page 16 and page 135.
276
Action

Advertisement

Table of Contents
loading

Table of Contents