Integrated Cinema Processor - Christie CP42LH Service Manual

Hide thumbs Also See for CP42LH:
Table of Contents

Advertisement

5. Press the red ejector tabs at the top and bottom of the PIB inward.
6. Press the red and black ejector tabs at the top and bottom of the PIB inward to release the PIB
from the backplane.
7. Pull the PIB from the card cage.
8. Activate marriage when replacing the PIB. See the User Manual for instructions.

Integrated cinema processor

Estimated replacement time: 4 minutes + 15 minutes for the software update
1. Remove the
Front top
2. Remove the
Light engine
3. Remove the
Card cage
4. Remove the card cage security ring.
5. Press the red ejector tabs at the top and bottom of the ICP inward.
6. Press the red and black ejector tabs at the top and bottom of the ICP inward to release the ICP
from the backplane.
7. Pull the ICP from the card cage.
8. Activate marriage when replacing the ICP. See the User Manual for instructions.
Integrated media block
Estimated replacement time: 4 minutes + 15 minutes for the software update
1. Remove the
Front top
2. Remove the
Light engine
3. Remove the
Card cage
4. Remove the card cage security ring.
5. Press the red ejector tabs at the top and bottom of the IMB inward.
6. Press the red and black ejector tabs at the top and bottom of the IMB inward to release the IMB
from the backplane.
7. Pull the IMB from the card cage.
8. Activate marriage when replacing the IMB. See the User Manual for instructions.
Light engine quick disconnect
Estimated replacement time: 10 minutes
1. Remove the
Front top
2. Remove the
Light engine
3. Loosen the thumbscrew securing the LEQD to the projector.
CP42LH Service Manual
020-101686-03 Rev. 1 (08-2016)
lid, see page 41.
lid, see page 42.
cover, see page 43.
lid, see page 41.
lid, see page 42.
cover, see page 43.
lid, see page 41.
lid, see page 42.
Parts and Module Replacement
68

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents