Distribution Systems And Pel Hook-Ups; Single Phase 2-Wire; Single Phase 3-Wire (Split Phase From A Center Tap Transformer) - AEMC PEL102 User Manual

Power energy logger
Hide thumbs Also See for PEL102:
Table of Contents

Advertisement

3.6 Distribution systems and PEL Hook-ups

This chapter describes how the current sensors and voltage test leads have to be connected to your installation according
to its distribution system. The PEL shall also be configured (see § 4.4.3) for the selected distribution system.
Source
Load

3.6.1 single Phase 2-Wire

For Single Phase 2-Wire measurements:
Connect the terminal N test lead to the neutral conductor
Connect the terminal V1 test lead to the L1 phase conductor
Connect the current probe to the L1 phase conductor
Ensure that the current arrow on the sensor is directed towards the
load. This ensures proper phase angle for power measurements
and other phase sensitive measurements.

3.6.2 single Phase 3-Wire (split Phase from a center tap transformer)

For Single Phase 3-Wire (Split Phase) measurements:
Connect the terminal N test lead to the neutral conductor
Connect the terminal V1 test lead to the L1 phase conductor
Connect the terminal V2 test lead to the L2 phase conductor
Connect the terminal I1 current probe to the LI phase
conductor
Connect the terminal I2 current probe to the L2 phase
conductor
Ensure that the current arrow on the sensor is directed towards the
load. This ensures proper phase angle for power measurements and
other phase sensitive measurements.
Power & Energy Logger Model PEL 102 and PEL 103
Find Quality Products Online at:
GlobalTestSupply
www.
V1
V2
V3
N
I1
Figure 12
L2
L1
N
V1
V2
V3
N
I1
Figure 13
.com
sales@GlobalTestSupply.com
L1
N
I2
I3
L1
N
L2
I2
I3
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pel103Pel 102

Table of Contents