Pallet Hold-Down Shipping Brackets; Location; Install The Cabinet Stand-Off Bolts - Thermo Scientific MAXQ SHKE435HP Operating And Maintenance Manual

High performance console incubated orbital shaker
Table of Contents

Advertisement

Section 1
Installation
Pallet Hold-down
Shipping Brackets
Install the Cabinet
Stand-off Bolts
1-2
Orbital Shaker
Model SHKE435HP and SHKE436HP Console Orbital Shakers are
shipped with the following materials:
2 - Keys for the lid lock (packaged and attached to outside of unit)
1 - T-handle 5/32" hex wrench
2 - Platform alignment studs ¼-20
1 - Shaker platform
6 - Grade 8, 5/32" hex socket flat head screws (provided with platform)
2 - 3/4" Open end wrench
2 - ¼-20 x 7" Stand-off bolts with rubber caps
1 - Phillips screwdriver for flask clip installation and removal
1 - 8¾" Phillips screwdriver for flask clip installation and removal
1 - Line cord (country of destination)
To secure the console shaker to
the shipping pallet, hold-down
brackets are attached to slots in
both sides of the cabinet. The
brackets are fastened to the
wood pallet with lag screws
(Figure 1-2).

Location

Install the shaker on a firm, level surface in an area free of dust and dirt.
To allow for lid opening, the back of the shaker must be at least 4 ½
inches from the wall. As the electrical plug is the "mains disconnect" for
the unit, the electrical wall outlet must remain accessible at all times.
To maintain the 4½ inch minimum distance between the rear of the unit
and the wall to allow for unobstructed lid opening, two ¼-20x7" bolts are
included in the parts bag.
Screw the bolts into the threaded holes on the back of the shaker cabinet
(Figure 1-3). The bolts
should be screwed in by
hand to the limit of the
threads. Further tightening
is unnecessary. Put the
protective rubber caps, also
supplied in the parts bag,
over the heads of the bolts.
Figure 1-2. Bracket
Figure 1-3. Rear View
Thermo Scientific

Advertisement

Table of Contents
loading

Table of Contents