Installation Compliance; Termination Location - Enerzone Cambridge EP00075 Installation And Operation Manual

Table of Contents

Advertisement

4.3.2 Installation compliance

To determine if your installation is compliant, the
exhaust venting system must end within the grid
on the venting system chart. The previous
installation has 2 feet of horizontal run and 12
feet of vertical run. It is thus standard since the
venting system ends in the gridded area.
WARNING
TO REDUCE THE RISK OF SMOKE SPILLAGE THERE SHOULD ALWAYS BE AT LEAST ONE FOOT OF
VERTICAL RISE FOR EACH FOOT OF HORIZONTAL RUN. IN ALL CASES, AT LEAST 3 FEET OF VERTICAL
RISE IS NEEDED.

4.4 Termination Location

Termination should not be located so that hot
exhaust gases can be a hazard. They can reach
temperatures of 500°F (260°C) and cause serious
burns.
CAUTION
TERMINATION COLLAR (SPARK ARRESTER) IS MANDATORY.
17
Cambridge Pellet Stove Installation and Operation Manual

Advertisement

Table of Contents
loading

Table of Contents