Floor Protection - Enerzone Cambridge EP00075 Installation And Operation Manual

Table of Contents

Advertisement

3.3 Floor Protection

For floor protection clearances refer to the following figure and table.
LETTER
E
F
G
H
THE STOVE MUST BE PLACED ON A CONTINUOUS (GROUTED JOINTS) NONCOMBUSTIBLE
MATERIAL SUCH AS CERAMIC TILE*, CEMENT BOARD, BRICK, MILLBOARD OR EQUIVALENT, OR
ANY OTHER APPROVED OR LISTED MATERIAL SUITED FOR FLOOR PROTECTION.
*Any type of tile will require a continuous non combustible sheet beneath to prevent the possibility of
embers falling through to the combustible floor if cracks or separation should occur in the finished
surface, this would include floor protection for built-in raised hearths. Check local codes for approved
alternatives.
**In Canada, you may reduce to the U.S. floor protection requirements (E) ONLY if the following
actions are respected: Allow for the appliance to shut-down and fires to be extinguish. Once
completely cool and all blowers have stopped you may proceed with opening the firebox or ash door.
14
CANADA
18" (460 mm)**
From door opening
N/A (USA only)
8" (205 mm)
8" (205 mm)
CAUTION
From door opening
From door opening
N/A (Canada only)
N/A (Canada only)
Cambridge Pellet Stove Installation and Operation Manual
USA
6" (155 mm)
6" (155 mm)

Advertisement

Table of Contents
loading

Table of Contents