Through A Factory Built Chimney - Enerzone Cambridge EP00075 Installation And Operation Manual

Table of Contents

Advertisement

4.5.4 Through a Factory Built Chimney

BEFORE INSTALLATION, THE CHIMNEY MUST BE CLEANED AND INSPECTED BY A QUALIFIED
CHIMNEY SWEEP OR INSTALLER.
1. Position stove following clearances given in Section 3.2
Minimum Clearances to Combustibles and following
vent manufacturer's instructions.
2. Install a stove adapter or a stove adapter tee onto the
appliance flue collar. If necessary, use a horizontal
additional length between the flue outlet and the tee.
3. Use a proper chimney adaptor for your installation.
4. Run the number of sections of vent necessary to go
through the chimney adaptor into the chimney.
5. Connect the vent to a stainless steel 4" liner according
to the vent manufacturer's instruction.
6. Install roof flashing and rain cap as per manufacturer's
instructions. If necessary, install and seal a storm collar.
IN THE U.S., THE USE OF A STAINLESS STEEL LINER IS MANDATORY. IN CANADA, IT IS NOT
MANDATORY BUT IS STRONGLY RECOMMENDED.
VENTING DIRECTLY IN AN OVERSIZED CHIMNEY AND OMITTING THE USE OF A STAINLESS STEEL
LINER CAN AFFECT CHIMNEY DRAFT AND DECREASE STOVE PERFORMANCES.
22
NOTE
WARNING
NOTE
Cambridge Pellet Stove Installation and Operation Manual

Advertisement

Table of Contents
loading

Table of Contents