GE N60 Instruction Manual page 351

Network stability and synchrophasor measurement system
Hide thumbs Also See for N60:
Table of Contents

Advertisement

CHAPTER 5: SETTINGS
UR IED 1
In this architecture, Devices 1 and 3 do not communicate directly. Therefore, Device 2 must act as a 'bridge'. The following
settings are applied:
UR IEC 1:
:
"HYB POTT
DIRECT OUT 2 OPERAND
: "2"
DIRECT INPUT 5 DEVICE ID
DIRECT INPUT 5 BIT NUMBER
: "2"
DIRECT INPUT 6 DEVICE ID
DIRECT INPUT 6 BIT NUMBER
UR IED 3:
:
"HYB POTT
DIRECT OUT 2 OPERAND
: "2"
DIRECT INPUT 5 DEVICE ID
DIRECT INPUT 5 BIT NUMBER
: "2"
DIRECT INPUT 6 DEVICE ID
DIRECT INPUT 6 BIT NUMBER
UR IED 2:
: "1"
DIRECT INPUT 5 DEVICE ID
DIRECT INPUT 5 BIT NUMBER
: "3"
DIRECT INPUT 6 DEVICE ID
DIRECT INPUT 6 BIT NUMBER
:
"HYB POTT
DIRECT OUT 2 OPERAND
:
"DIRECT INPUT
DIRECT OUT 3 OPERAND
:
"DIRECT INPUT
DIRECT OUT 4 OPERAND
The figure shows the signal flow among the three IEDs.
N60 NETWORK STABILITY AND SYNCHROPHASOR MEASUREMENT SYSTEM – INSTRUCTION MANUAL
Figure 5-119: Single-channel open-loop configuration
TX1
RX1
UR IED 3
TX1"
: "2" (this is a message from IED 2)
: "4" (effectively, this is a message from IED 3)
TX1"
: "2" (this is a message from IED 2)
: "3" (effectively, this is a message from IED 1)
: "2"
: "2"
TX1"
5" (forward a message from 1 to 3)
6" (forward a message from 3 to 1)
RX1
RX2
UR IED 2
TX1
TX2
RX1
TX1
842714A1.CDR
INPUTS/OUTPUTS
5
5-235

Advertisement

Table of Contents
loading

Table of Contents