E-05 Load Dump
Dumping of an electric load, in combination with a battery with reduced
buffering ability, results in an energy-rich overvoltage pulse due to the generator
characteristics. This pulse is simulated by means of this test.
E-07 Slow Decrease and Increase of the Supply Voltage
The slow decrease and increase of the supply voltage is simulated as it occurs
during the slow decharging and charging procedure of the vehicle battery.
Copyright© Itech Electronics Co., Ltd.
Function and Features
54
Need help?
Do you have a question about the IT6512C and is the answer not in the manual?
Questions and answers