The Captive Thumbscrews That Secure The Node - IBM SAN Volume Controller 2145-CG8 Hardware Maintenance Manual

System storage san volume controller series
Hide thumbs Also See for SAN Volume Controller 2145-CG8:
Table of Contents

Advertisement

Figure 38. The captive thumbscrews that secure the node and the shipping brackets
2. Reconnect the Fibre Channel and Ethernet cables. Ensure that you replace the Fibre Channel and
Ethernet cables in the same ports from which they were removed.
3. Replace the cable-retention bracket. See "Replacing the cable-retention bracket" on page 39.
Replacing the SAN Volume Controller 2145-8G4 in a rack
Follow these instructions when you are prompted to replace the SAN Volume Controller 2145-8G4.
Attention: Do not touch the power control switches on adjacent SAN Volume Controller nodes when
you remove or install SAN Volume Controller nodes in a rack. Touching these switches on adjacent SAN
Volume Controller nodes might cause those devices to turn off and make customer data inaccessible.
Perform the following steps to replace the SAN Volume Controller 2145-8G4 in a rack:
1. Fully extend the support slides.
2. Align the node on the slide rails and push the node fully into the rack. Secure the node to the front
mounting flanges with the captive thumbscrews ( 1 in Figure 39 on page 60).
Chapter 2. Removing and replacing parts
59

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents