The San Volume Controller 2145-8G4 With; Attaching The Cable Retention Bracket To The - IBM SAN Volume Controller 2145-CG8 Hardware Maintenance Manual

System storage san volume controller series
Hide thumbs Also See for SAN Volume Controller 2145-CG8:
Table of Contents

Advertisement

2. At the back of the cabinet, remove the securing bolt from the node side rail next to the power supply,
as shown in Figure 31.
Figure 31. The SAN Volume Controller 2145-8G4 with cable-retention bracket type B attached
3. Slide the cable-retention bracket over the cable and position it over the side rail. Secure it in place
using the original bolt.
Replacing the SAN Volume Controller 2145-8F4 cable retention bracket
The cable-retention bracket attaches to the support rail at the back of the SAN Volume Controller
2145-8F4 node.
To attach the bracket, perform the following steps:
1. Insert the power cable in the node.
2. Insert the bracket onto the power cable so that the power cable is held by the slot on the end of the
bracket. Figure 32 provides a view of how to align the cable-retention bracket with the cable.
Figure 32. Attaching the cable retention bracket to the SAN Volume Controller 2145-8F4 power cable
3. Position the cable-retention bracket against the support rail and attach the bracket onto the slot in the
rear of the rail.
Chapter 2. Removing and replacing parts
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents