Chapter 8: Administration: Diagnostics; Copper Ports Tests - Cisco 500 Series Administration Manual

Stackable managed
Hide thumbs Also See for 500 Series:
Table of Contents

Advertisement

Administration: Diagnostics

Copper Ports Tests

Cisco 500 Series Stackable Managed Switch Administration Guide
This section contains information for configuring port mirroring, running cable
tests, and viewing device operational information.
It covers the following topics:
Copper Ports Tests
Displaying Optical Module Status
Configuring Port and VLAN Mirroring
Viewing CPU Utilization and Secure Core Technology
The Copper Test page displays the results of integrated cable tests performed on
copper cables by the Virtual Cable Tester (VCT).
VCT performs two types of tests:
Time Domain Reflectometry (TDR) technology tests the quality and
characteristics of a copper cable attached to a port. Cables of up to 140
meters long can be tested. These results are displayed in the Test Results
block of the Copper Test page.
DSP-based tests are performed on active GE links to measure cable length.
These results are displayed in the Advanced Information block of the
Copper Test page.
Preconditions to Running the Copper Port Test
Before running the test, do the following:
(Mandatory) Disable Short Reach mode (see the Port Management > Green
Ethernet > Properties page)
8
136

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents