Installing The Chassis - Nortel CVX 1800 Hardware Installation Manual

Multi-service access switch
Table of Contents

Advertisement

CVX 1800 Hardware Installation Guide
Installing the CVX 1800 Chassis

Installing the Chassis

To install the chassis, follow these steps:
Step
1
2
3
1-22
Action
Have at least two people lift the chassis to the desired installation
height.
Move the chassis up or down to properly align the positions on the
mounting flanges with the mounting holes on the Telco or EIA rack.
Align the flange holes with the holes on the front vertical supports of the
rack.
296-1011-200 Rel. 5.0, Doc. Rev. 08.01
CVX-0109A
(continued)

Advertisement

Table of Contents
loading

Table of Contents