Nortel CVX 1800 Hardware Installation Manual page 245

Multi-service access switch
Table of Contents

Advertisement

,
PTE 2000 rack
1-8
2-8
R
rack cooling requirements
rack mounting the CVX 1800
,
in a Telco rack
1-20
2-20
,
in an EIA rack
1-20
2-20
installing mounting flanges
2-19
locating the mounting holes
repositioning the mounting flanges
radio frequency specifications
redundant line termination modules (RLTMs),
replacing
4-23
regulatory compliance information
replacement hardware, ordering
S
SCC-RLTM
interface specifications
replacement
4-23
SCC-RLTM interface specifications
SCC-SM
replacement
4-15
system control card (SCC)
,
,
LEDs
3-53
3-54
3-55
replacing the SCC-RLTM
replacing the SCC-SM
4-15
SCC-RLTM specifications
T
T1 shielded cable specifications
tandem CVX to RAS CVX crossover cable
Telco rack hole spacing
1-20
terminal server
3-48
terminal, connecting to the CVX 1800
W
wrist strap, antistatic
4-2
296-1011-200 Rel. 5.0, Doc. Rev. 08.01
,
1-11
2-11
,
1-16
2-16
,
,
,
1-17
1-19
2-17
,
1-22
2-22
,
1-16
2-16
,
A-6
B-6
iii
4-49
,
A-22
B-19
,
A-23
B-20
,
3-56
4-23
,
A-22
B-19
,
A-14
B-14
A-15
,
2-20
3-41
Index-3

Advertisement

Table of Contents
loading

Table of Contents