Space Requirements; Flooring Requirements; Depths For Drilling - Nortel CVX 1800 Hardware Installation Manual

Multi-service access switch
Table of Contents

Advertisement

CVX 1800 Hardware Installation Guide
Mounting the CVX 1800 in a Rack

Space Requirements

The following table lists the PTE 2000 racks and dimensions.
Rack Type
NEBS-compliant rack
ETSI-compliant rack

Flooring Requirements

You must anchor the PTE 2000 rack to the equipment-room floor. The flooring
can be one of the following types:
Raised floor tiles, ideally with a clearance of 18 in. (45.5 cm), and a subfloor
cable management system
Bare concrete floor

Depths for Drilling

If you plan to install the PTE 2000 floor anchors on a bare concrete floor, you
must drill to the following depths:
2 in. (51 mm) for the 3/8 in. anchor (for zone 2 earthquake compliance,
NTRU0323/NTRU0326)
4 in. (103 mm) for the M12 anchor (for zone 4 earthquake compliance,
NTRU0324/NTRU0328)
2-10
Part Number
NTRU0134
NTRU0234
Warning: Before you begin to drill, make sure you are familiar with the
building construction. If you plan to drill holes in a below-ground
structure, make sure that you do not drill through the concrete into the
vapor barrier. If you do, groundwater may seep through the anchor hole.
Width in
Depth in
Inches (mm)
Inches (mm
23.6 (600)
23.6 (600)
23.6 (600)
23.6 (600)
296-1011-200 Rel. 5.0, Doc. Rev. 08.01
Height in
Inches (mm)
83.66 (2125)
86.6 (2200)

Advertisement

Table of Contents
loading

Table of Contents