Installing The Turbocharger - ABB TPL85-B14 Operation Manual

Hide thumbs Also See for TPL85-B14:
Table of Contents

Advertisement

7.3
7.3
CAUTION
© Copyright 2016 ABB. All rights reserved.
Removal and installation

Installing the turbocharger

Installing the turbocharger
Remove cover from oil connection.
Fasten each of two sets of lifting gear to each of two bearing casing
ribs provided for this purpose.
Oil orifice plates
An orifice plate for adjusting the oil pressure is fitted in each of the two
oil inlet channels in the bearing casing. When the cartridge group, the
bearing casing or the turbocharger is fitted to the engine, it must be en-
sured that the orifice plates that are specified for the turbocharger have
been installed in the two oil inlet channels.
Check correct installation of oil orifice plates.
Adapt turbocharger to suit engine.
Tighten fixing screws in foot in accordance with engine builder's in-
structions.
Fasten gas, air and oil lines in accordance with engine builder's in-
structions.
Adapt insulating shell to suit bearing casing and fasten it.
Plug in cable connector on speed sensor.
Operation Manual / TPL85-B14/-B15/-B16
7
7.3
Page 88

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents