ABB TPL85-B14 Operation Manual page 64

Hide thumbs Also See for TPL85-B14:
Table of Contents

Advertisement

Operating the cleaning
medium vessel
NOTICE
© Copyright 2016 ABB. All rights reserved.
Maintenance
Cleaning the compressor during
operation
Fulfil operating state prerequisites for cleaning compressors with XC4
without fail before cleaning.
Open cover (05) of cleaning medium vessel (01).
Fill with clean water.
Screw down cover (05).
Open valve (06) for about 3 minutes.
Close valve (06) and check that all water has been sucked out.
After cleaning, wait at least 5 minutes with engine running to allow tur-
bocharger to dry.
If the cleaning operation is not satisfactory, it may be repeated up to
two times.
If the cleaning result is still not satisfactory after three attempts and the
engine values are also unsatisfactory, we recommend that you have the
turbocharger inspected and cleaned by an official ABB Turbocharging
Service Station.
Cleaning parameters per turbocharger compressor
Product
TPL85-B
Operation Manual / TPL85-B14/-B15/-B16
5
5.4
Contents of water vessel
Page 62
[dm
]
3
3.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents