2.
For the Installer

2.4.10 Installing the side panels

– Screw in 2 screws on the bottom of each side of the base halfway – Fig. 23. Release the side panels and hook
them into the installed screws at the bottom (Fig. 24, 25) and loosely screw the top on with one self-tapping
screw and one saw tooth ring for earthing – Fig. 26.
Note!
Only screw the cladding screws on loosely at first; do not adjust the cladding (gap size) and tighten
all screws until all cladding parts have been installed.
2 each of
Fig. 23 Screw in 2 screws on each side of the base
Fig. 24 Hooking the side panels in with screws at the
bottom
1 x
Fig. 26 Screws the side panels on loosely at the top front.
Fig. 25 Hooking in side panels