Start-Up And Maintenance; Functional Test; Combination With Automatic Boiler (E.g. Pellet Or Oil-Fired Boiler) - Windhager LOGWIN PREMIUM TOUCH Operating Manual

Wood gasification boiler
Hide thumbs Also See for LOGWIN PREMIUM TOUCH:
Table of Contents

Advertisement

1.
Important information for system operators
1.5

Start-up and maintenance

Have Windhager Customer Service or one of our customer service partners put your new boiler into service. In this way,
all functions of the new unit will be thoroughly checked; you will also benefit from the detailed information provided by
the system installer. Installation by a qualified technician as well as the maintenance required by the warranty condi-
tions and undertaken by Windhager Customer Service or a customer service partner will guarantee the optimal use and
service life of your boiler system. This is the only way to assure the benefits of this technologically advanced boiler and
guarantee safe, environmentally friendly and energy-saving system operation.
The following preconditions must be met before you order the initial start-up:
1.) Boiler installed correctly.
2.) System fully wired up electrically.
3.) System rinsed, filled and vented – heat consumption must be possible.
4.) Hot water tank connected to domestic water and filled.
5.) Sufficient quantity of fuel available (pellets, split logs, oil or gas).
6.) The customer must be present during start-up.
The initial start-up cannot be carried out if any of these points are neglected. The customer will be charged for
any unnecessary costs arising as a result.
Start-up and maintenance by Windhager Customer Service or a customer service partner are part of the guarantee
requirements of the enclosed "Warranty conditions".
Note!
When the boiler is started for the first time, bad smells may result from gas emissions from insulation or
paint residue being burnt off. Ensure that the boiler room/installation room is therefore well vented. Con-
densation may also form near the coasting surfaces and the combustion chamber temperature may only
increase after a delay.
1.6

Functional test

EN 12828 and ÖNORM B8131 require that the function of the system and related safety equipment be checked and
certified yearly by a qualified technician (installer, heating system contractor).
At two-year intervals, in accordance with ÖNORM H 5195 (2010 edition), the heating water condition must be checked
by a heating expert (installer) (see installation instructions – Heating water) to prevent corrosion and sediment accu-
mulation in the heating system and boiler.
In the event of repair work requiring a change of water in the heating system, the heating water is to be checked within
4 to 6 weeks after such work.
Corrosion and sediment resulting from improper heating water are not covered by the warranty.
1.7
Combination with automatic boiler (e.g. pellet or oil-
fired boiler)
If the LogWIN and an automatic boiler (e.g. pellet or oil-fired boiler) are connected to one flue, the cladding, filling,
lighting and ash doors and all cleaning openings of the LogWIN must be closed when the automatic boiler is operating
in order for the cladding door switch to be released and the automatic boiler to operate correctly (inleaked air).