ABB i-bus
EIB
3.4

Software menu

Normal mode*
Active/reactive power
Voltage indicators
Consumption indicator
Functional indicator
OK/Error symbol
Tariff indicators
S
3 Error
S
= Press 'SET' button
= Press 'SCROLL' button
Sc
= Press 'SCROLL' button > 3 seconds
LSc
3.5

Installation self-test

EIB Delta-Meter
Electricity Meters
Alternative mode*
LCD segment test
Active/reactive power
with an additional
decimal place
LSc
Total of all tariffs
Error codes
S
Sc
4 InStr
Sc
The installation self-test checks the connection and wiring of EIB Delta-
Meters and can detect the following installation errors:
current or voltage connections that are missing or have reverse polarity
current, voltage or frequency values that are outside the specified
tolerance
internal errors
The installation self-test is carried out automatically approx. every 8 seconds.
If device or installation errors occur, they are reported on the LCD display
with the 'Error' signal.
To simplify the fault removal process, the various types of errors are also
displayed as installation error codes. These error codes can either be read out
in 'Alternative mode' or Menu mode [3 Error]. A detailed description of the
error codes and notes on remedying the fault can be found in section 5.1.
Note: So that the EIB Delta-Meters can successfully carry out the installation
self-test, the meter must be connected with all phases and there must
be a load current of at least 100 mA per phase in the secondary
circuit.
LSc
LSc
Menu
mode
End
Sc
Instrument mode*
Active/reactive power
(L1,L2,L3,Σ)
Voltage (L1,L2,L3)
Current (L1,L2,L3)
Cos ϕ (L1,L2,L3,Σ)
Frequency
* Note: The display of the measured
variables is dependent on the meter type
13