Configuration Procedure; Example For Configuring Virtual Server; Network Requirements - TP-Link TL-R470T Plus Configuration Manual

Table of Contents

Advertisement

Configuring Transmission

7.2.4 Configuration Procedure

Follow the steps below to configure load balancing on the router:
 Configuring the WAN parameters
For WAN1 port, configure the connection type as PPPoE, and specify Upstream and
Downstream bandwidth for this link based on your ADSL bandwidth (You could consult
your internet Service Provider for the bandwidth information).
For WAN2 port, configure the connection type as Dynamic IP, and specify Upstream
and Downstream bandwidth for this link according to data that ISP provides.
Make sure two WAN links can work properly and have access to the internet.
 Configuring the Load Balancing
Choose the menu Transmission> Load Balancing > Basic Settings to load the
configuration page. Enable Load Balancing globally, and click Save. Enable Application
Optimized Routing, and enable Bandwidth Based Balancing Routing on WAN1 port and
WAN2 port. Click Save.
Figure 7-8 Configuring the Load Balancing
7.3

Example for Configuring Virtual Server

7.3.1 Network Requirements

The network administrator builds up a FTP server on the local network and wants to share it
on the internet.
Configuration Examples
Configuration Guide
77

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tl-r480t plus

Table of Contents