Batco 2035 Assembly Manual page 113

Portable grain belt conveyor
Table of Contents

Advertisement

PORTABLE GRAIN BELT CONVEYOR – STANDARD
Install the 5190 Gearboxes
1. Fill each of the two 5190 gearboxes (1) with 80W-90 gear lube until oil flows out the side of the indicator
port.
2. Attach the gearboxes to the gearbox mount with 1/2" x 1–1/2" hex bolts (4) and 1/2" lock washers (3).
3. Connect the gearboxes with two sprockets (5), two 3/8" x 2" keys (6), and a chain connector (7).
4. Install the breather (8) to each gearbox.
5. Attach the half coupling guards (10) to the gearbox mount with 3/8" x 1" hex bolts (9) and 3/8" locknuts
(12).
6. Fasten the coupling guards together using 1/4" x 3/4" bolt (2), 1/4" lock washer (11), and 1/4" locknut (13).
Table 47. 5190 Gearbox Components
Item
Description
1
5190 Gearbox 1:1 CW/CW, 1–1/2
2
1/4" x 3/4" Bolt
3
1/2" Lock Washer
4
1/2" x 1-1/2" Bolt Hex GR8
5
Sprocket H80B12 X 1.5
6
3/8" x 2" Key
7
Chain Connector Double 80 x 12
8
Breather
9
3/8" x 1" Hex Bolt GR8
10
Coupling Guard (1/2)
11
1/4" Lock Washer
12
3/8" Nut Nylock
13
1/4" Nut Nylock
P1512021 R6
4. ASSEMBLY
113

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents