ACID VOLUME
BASE VOLUME
HCl WATER VOLUME
TN CLEANING VOLUME 25.0l ~150DAYS
DI WATER VOLUME

Autocal Program

TIME
MONDAY
TUESDAY
WEDNESDAY
THURSDAY
FRIDAY
SATURDAY
SUNDAY
25.0l ~ 35DAYS
 ACID VOLUME allows the user to enter the volume of the acid
 It is strongly recommended that each time acid and base
25.0l ~ 35DAYS
 BASE VOLUME allows the user to enter the volume of the base
10.0l ~ 38DAYS
 HCl WATER VOLUME allows the user to enter the volume of the
 TN CLEANING VOLUME allows the user to enter the volume of
25.0l ~ 60DAYS
 DI WATER VOLUME allows the user to enter the volume of the
00:00
 TIME (00:00 by default) schedules the Zero & Span Calibration
S
CHECK
 In this menu, Zero and/or Span Calibration reactions and/or
Z
CAL
ZS
CAL
--
--
--
--
 If CAL (CALIBRATION) is programmed, system generates the
--
--
--
--
 The meaning of the abbreviations used in this menu are as
reagent. When the volume is programmed, system automatically
calculates the number of days acid reagent will last.
reagents are replaced or topped up, a Zero Calibration cycle is
activated using the Start New Reagent Cycle function in Install
New Reagents menu or alternatively using the Run Zero
Calibration function in Zero Calibration menu.
reagent. When the volume is programmed, system automatically
calculates the number of days base reagent will last.
HCl water solution if programmed in systems built with FMI
heavy duty Circulation Pump. When the volume is programmed,
system automatically calculates the number of days HCl water
solution will last.
the TN cleaning solution. When the volume is programmed,
system automatically calculates the number of days TN cleaning
solution will last.
DI water. When the volume is programmed, system
automatically calculates the number of days DI water will last.
or Check reactions time (in HR:MIN) for the weekdays if any is
programmed below.
Check reactions are scheduled if programmed on a particular
day of the week. Note that by default, there will be no scheduled
zero and span cycles in the system.
zero and span adjust figures which are applied to the reaction
results. If CHECK is programmed, system does not generate
any zero or span adjust figures.
follows:
- -
No function is programmed.
S
Span reactions only.
Z
Zero reactions only.
ZS
Zero reactions followed by Span reactions.
CAL
Calibration reactions
CHECK Check reactions.