Model 210 - IBM TotalStorage IP Storage 200i 110 Installation Manual

Table of Contents

Advertisement

Model 210

To attach the cables:
1. Press the safety latches and slide the engine halfway into the rack.
2. For each of the three power cords, connect one end of the power cord to a
3. Connect one end of the Gigabit Ethernet cable to the Gigabit Ethernet adapter
4. Route the power and network cables through the cable-restraint bracket on the
5. Slide the engine into the rack until the safety latches snap shut.
6. Route the cables through the cable-management assembly on the rack.
power supply and the opposite end to a properly wired and grounded electrical
outlet.
located in expansion slot 4, and connect the opposite end to the system
network.
Note: You may use a 10/100 Ethernet cable if your network does not support
Gigabit Ethernet.
rear of the engine by opening the bracket and threading the cables through the
slots in the interior of the bracket, and close the bracket.
Chapter 2. Installation procedures
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Totalstorage ip storage 200i 210

Table of Contents