Chapter 2. Installation Procedures; Preinstallation Checklist - IBM TotalStorage IP Storage 200i 110 Installation Manual

Table of Contents

Advertisement

Chapter 2. Installation procedures

This chapter provides procedures for installing the IP Storage 200i Models 110 and
210.

Preinstallation checklist

Before beginning an installation, record your product information in Table 3. Refer to
this information when service is necessary.
The following items are shipped with the IP Storage 200i. Verify that you have all
the items listed.
v Model 110 or Model 210
v Power cords (3)
v Documentation set, including:
v Rack-mounting kit (for Model 210), including:
If you ordered options for the appliance, this package might contain additional
hardware or publications for those options.
Note: Visually inspect the hardware to ensure that it was not damaged during
© Copyright IBM Corp. 2001
Table 3. Product information
Record your product information in this table.
Product name
Machine type
Model number
Serial number
– Recovery CD
– Publications and Code CD
– Safety Information—Read This First
– Quick Start Instructions
– IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide
– Cable-management assembly
– Front and rear rack-mounting templates
– 7 cable straps
– 10 cable ties
– 12 cage nuts
– 12 clip nuts
– 2 screw packages
– 2 slide rails
shipping. If any items are missing or damaged, contact your place of
purchase.
IBM TotalStorage IP Storage 200i
4125
_____________________________________________
_____________________________________________
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Totalstorage ip storage 200i 210

Table of Contents