IBM TotalStorage IP Storage 200i 110 Installation Manual page 20

Table of Contents

Advertisement

4. Using the stickers provided on the rack-mounting template, mark holes on the
5. Insert the cage nuts using a screwdriver or the cage-nut-insertion tool or slide
6. Use the pins on the slide rail to align the rail with the rack. Use the M6 screws
8
IBM TotalStorage IP Storage 200i Models 110 and 210 Installation Guide
front and rear of the rack in the locations indicated by the arrows. The stickers
indicate where to place the clip nuts or cage nuts in the next step.
Note: Position the template to the rack so that the edges of the template do
not overlap any other devices to be installed.
on the clip nuts (as required for your rack) into all marked holes.
1
to secure the slide rail to the rack. Repeat this step for the other slide rail.
1
2
A
2
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Totalstorage ip storage 200i 210

Table of Contents