Denver Instrument P-114 Operation Manual page 7

Pinnacle series
Hide thumbs Also See for P-114:
Table of Contents

Advertisement

Weighing pan
Spill ring
Stainless steel
platform
Analytical Balances and Draft Shield
To attach draft shield, place it upon the balance so the grooves line
up when the draft shield is approximately at a 30° angle. Pull the
pin at the rear of the draft shield and turn clockwise until it is in
line with the balance. Release the pin. Place the components listed
below inside the chamber in the order given:
• Stainless steel platform
• Spill Ring
• Weighing Pan
Place the draft
shield on the
balance so the
grooves line up
approximately
at a 30° angle
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents