Gathering All Equipment - Abbott i-STAT 1 System Manual

Hide thumbs Also See for i-STAT 1:
Table of Contents

Advertisement

After updating the first i-STAT 1 Handheld, follow these steps to update additional
Handhelds with the Handheld-to-Handheld Process

Gathering All Equipment

2.1
Before starting the process make sure all the
required equipment is available:
Recently updated i-STAT 1 Handheld (referred to in this section
as the Sending Handheld) charged to 7.5 volts or higher*
The Handheld unit to be updated (referred to in this section
as the Receiving Handheld) charged to 7.5 volts or higher*
Electronic Simulator
* For information on checking battery power, see page 4, step
Art: 725708-00E
Rev. Date 07-FEB-12
2.
1.2
Handheld-to-Handheld
11

Advertisement

Table of Contents
loading

Table of Contents