Safety Tests - Nellcor OXIMAX N-595 Service Manual

Hide thumbs Also See for OXIMAX N-595:
Table of Contents

Advertisement

Performance Verification

Safety Tests

28
6. The monitor will display:
90 %SpO
2
60 BPM
no alarm
low level modulation
7. Disconnect all equipment and turn off the monitor.
The N-595 safety tests meet the standards of, and are performed in accordance
with, IEC 60601-1 (EN 60601-1, Amendment 1, Amendment 2,) and
UL 2601-1, for instruments classified as Class 1 and TYPE BF and
ANSI/AAMI Standard ES1.
Applicable tests for these standards are listed below. The technician must be
familiar with the Standards applicable to their institution and country. Test
equipment and its application must comply with the applicable standard.
Ground Integrity, see page 86 for test value.
Earth Leakage Current, see page 86 for test values.
Enclosure Leakage Current, see page 87 for test values.
Patient Applied Risk Current, see page 87 for test values.
Patient Isolation Risk Current, see page 87 for test values.
Note:
Patient Applied Risk Current and Patient Isolation Risk Current:
The leakage test lead from the test equipment must be connected to
the N-595 SpO
2
cable using a male 9-pin "D" type connector that has all pins shorted
together. During these tests the monitor will be in a constant reset
mode. That is, the "Nellcor" screen displays followed by a blank
screen, then the "Nellcor" screen, the cycle repeats throughout the
test.
Sensor Port through the DOC-10 pulse oximetry

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents