Initial Setup - Nellcor OXIMAX N-595 Service Manual

Hide thumbs Also See for OXIMAX N-595:
Table of Contents

Advertisement

Performance Verification

Initial Setup

Test #1: SpO
2
24
1. Sensor Port
1. With the monitor turned off, connect the DOC-10 pulse oximetry cable to
the sensor port (1).
2. Connect the SRC-MAX tester to the other end of the DOC-10 cable.
3. Turn on the monitor by pressing the POWER ON/OFF button.
4. After the monitor completes POST, the monitor will:
be in SpO
alarm
2
display an SpO
2
display a pulse rate of 60 (Test pass criteria is 57 to 63 BPM)
display low level modulation
1. Press the SRC-MAX % SpO
90 LED will light.
2. The monitor will display three dashes until the SRC-MAX stabilizes at 90
%SpO
. The test pass criteria is 88 to 92 %SpO
2
of 75 (Test pass criteria is 73 to 77 %SpO
selection button. The SRC-MAX %SpO
2
)
2
2
.
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents