Shift/System Check - Philips HEARTSTART XLT M3500B Instructions For Use Manual

Defibrillator/monitor
Table of Contents

Advertisement

Operational Checks
11-4

Shift/System Check

To perform the Shift/System Check:
1. Turn the HeartStart XLT off.
2. Connect a 50 ohm test load to the pads patient cable (instead of pads).
3. If a Data Card is routinely used, insert a Data Card into the HeartStart
XLT.
4. If a power module is used, unplug the power module.
5. Insert a charged battery.
Print
6. While pressing
Strip
7. Follow the prompts on the display to proceed with the test. If the message
appears, check the information in Table 12-2 and Table 12-3 .
If the message continues to appear, do not use the device, and call for
service.
The test takes less than a minute to complete. When it is done, a report is
printed, as shown in Figure 11-1. Test results are listed as Pass or Fail, with
the exception of the Data Card Test. For the Data Card Test, the results indi-
cate either the amount of storage time remaining on the data card or that no
data card is present.
Figure 11-1 Shift/System Check Report
Shift/System Check
Current Tests:
General System Test
ECG Test
Backup Power Test
SpO2 Test:
Data Card Test
Defib Test
Pacer Test
, press On to start the test.
8 Jan 1999 13:52:17
Qty/Check List:
___ Defibrillator Inspection
Pass
___ Cables/Connectors
Pass
___ Defibrillation Pads
Pass
___ Monitoring Electrodes
Pass
___ Charged Batteries
2:00
___ AC/DC Power Module
Pass
___ Printer Paper
Pass
___ Data Card
___ Ancillary Supplies
___ SpO2 Sensor
SN:US00000001
Maintaining the HeartStart XLT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents