3.2
MAIN POWER wiring
Pole disconnect means must be incorporated according to
current rating.
Connect 230V power to 18 - 19 - 20 terminals on JP9 terminal block,
paying attention to respect polarity (18 PHASE– 20 NEUTRAL).
3.3
START controls wiring
Wire the START control/push-button to 1 and 4 terminals on JP4
terminal block (N.O. contact).
Additional START controls/push-buttons can be wired in parallel
(N.O. contact).
3.3.1 TIMER (for permanent opening command) wiring
Wire the TIMER to 1 and 4 terminals on JP4 terminal block
(N.O. contact).
NOTICE:
IF WIRING A TIMER-CLOCK YOU MUST SET
MULTI-OCCUPATION FUNCTION
3.3.2 KEY-SWITCH wiring
Wire the KEY-SWITCH to 1 and 4 terminals on JP4 terminal
block (N.O. contact).
3.4
PEDESTRIAN START controls wiring
Wire the PEDESTRIAN START control/push-button to 3 and 4 terminals
on JP4 terminal block (N.O. contact).
Additional PEDESTRIAN START controls/push-buttons can be wired in
parallel (N.O. contact)
7
PROTECO S.r.l.
Via Neive, 77 - 12050 Castagnito (CN) ITALY
ON
Tel. +39 0173 210111 - Fax +39 0173 210199
JP9
18
19
20
POLE
DISCONNECT
DEVICE
230V
JP5
JP4
1
2
3
4
5
6
7
JP5
JP4
1
2
3
4
5
6
7
JP5
JP4
1
2
3
4
5
6
7
JP5
JP4
1
2
3
4
5
6
7
info@proteco.net - www.proteco.net
JP6
8
9
10 11
JP6
8
9
10 11
JP6
8
9
10 11
JP6
8
9
10 11
Q80A_8_2017