Proteco Electric Lock & Interface Card Installation for Q71A & B
Components Required:
1 x Horizontal Lock
1 x MEL 56 Interface Card
1 x 2 core CAT5 / Alarm Cable
Installing the Lock onto the Gate
For Double Gates: Fit the horizontal lock on the leading edge of the
leaf that will be opening first and closing second. Fit the striker plate
onto the gate that opens second and closes first.
For Single Gates: Fit the horizontal lock on the leading edge of the
gate and fir the striker plate onto the post or pillar that the gate is
closing up to.
Dimensions of Horizontal Lock
Measurements in millimetre (mm)
Barrel length is 50mm long with a 25mm diameter

Advertisement

loading

Summary of Contents for Proteco Q71A

  • Page 1 Proteco Electric Lock & Interface Card Installation for Q71A & B Components Required: 1 x Horizontal Lock 1 x MEL 56 Interface Card 1 x 2 core CAT5 / Alarm Cable Installing the Lock onto the Gate For Double Gates: Fit the horizontal lock on the leading edge of the leaf that will be opening first and closing second.
  • Page 2 Installing the Lock onto the Gate For Double Gates: Fit the horizontal lock on the leading edge of the leaf that will be opening first and closing second. Fit the striker plate onto the gate that opens second and closes first. For Single Gates: Fit the horizontal lock on the leading edge of the gate and fir the striker plate onto the post or pillar that the gate is closing up to.
  • Page 3 Step 5 – Slide lock mechanism into cradle and replace end cap on other end of cradle – A1 Step 6 – Remove locking screw for the key release – C. (Fig.2 hole C illustrated right) Move to the left and place into hole D. The arrangement should look like C1 (Illustrated right) Step 7 –...
  • Page 4 Fixing Lock onto the gate Choose location for installing the lock on the leading edge of the gate and cut out hole for the barrel feed. The barrel diameter is 25mm. Length of Barrel is 50mm Line striker with the lock and fix securely to pillar.
  • Page 5 Only the centre pin of the lock sits outside the striker plate unit – the rest of the lock pin mechanism sits inside – Illustrated below: The above is critical to the locks operation. When the lock receives a 12v charge from the MEL 56, the tension in the spring mechanism releases and a loud “snap”...
  • Page 6 Wiring of the Electric Lock & MEL 56 Interface card Before replacing the cover of the lock, connect the lock terminals to the gate automation control board. INSTALL TIP It may be easier to access the terminal block by removing the locking mechanism from its cradle.
  • Page 7 Place your two cables into the terminal strip, and screw tightly. Keep the cable clear of the sides when placing back into the casing; this will avoid pinching of the cable and possible strand damage. If you have removed the lock from its cradle - Place the locking mechanism back into place, being careful not to pinch the cable.
  • Page 8 Place the MEL 56 unit onto the male pin socket on the Q71. Ensure the pins slot into the MEL 56 female socket tightly. Press gently with your finger to ensure good contact. The card should look like pictures shown (left).