Deceleration; Photocells Test; Reversing Stroke - Proteco Q80A Instruction Manual

Control panel for double/single swing gates 230v ac
Hide thumbs Also See for Q80A:
Table of Contents

Advertisement

DECELERATION Function
This function decelerates the leafs at the end of the opening/closing cycle.
1
Use
2
Press button
3
Use
4
Press button
then press button
or wait the timeout (20 seconds) to exit.
PHOTOCELLS TEST Function
If this function is enabled, the control panel performs a quick start-up test with the photocells to make
sure that they are in operation.
1
Use
2
Press button
3
Use
4
Press button
then press button
or wait the timeout (20 seconds) to exit.
REVERSING STROKE Function
For use with ELECTRIC-LOCK and MEL04 optional module only.
This setting makes the motors push in opposite direction for 1 second to help release
the electro-lock if the pins are tight in the striker plate.
1
Use
2
Press button
3
Use
4
Press button
then press button
or wait the timeout (20 seconds) to exit.
Q80A_8_2017
PROTECO S.r.l.
Via Neive, 77 - 12050 Castagnito (CN) ITALY
buttons to move inside the menu, till the display shows:
to confirm.
buttons to select:
to go back to the top level menus,
again till the display shows:
buttons to move inside the menu, till the display shows:
to confirm.
buttons to select:
to go back to the top level menus,
again till the display shows:
buttons to move inside the menu, till the display shows:
to confirm.
buttons to select:
to go back to the top level menus,
again till the display shows:
Tel. +39 0173 210111 - Fax +39 0173 210199
DECELERATION Function OFF
DECELERATION Function ON
PHOTOCELLS TEST Function OFF
PHOTOCELLS TEST Function ON
REVERSING STROKE Function OFF
REVERSING STROKE Function ON
info@proteco.net - www.proteco.net
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents