IBM Storwize V7000 Troubleshooting And Maintenance Manual page 124

Table of Contents

Advertisement

DANGER
4
4
When working on or around the system, observe the following precautions:
4
Electrical voltage and current from power, telephone, and communication cables are hazardous. To
4
avoid a shock hazard:
v Connect power to this unit only with the IBM provided power cord. Do not use the IBM
4
4
provided power cord for any other product.
4
v Do not open or service any power supply assembly.
4
v Do not connect or disconnect any cables or perform installation, maintenance, or reconfiguration
of this product during an electrical storm.
4
v The product might be equipped with multiple power cords. To remove all hazardous voltages,
4
4
disconnect all power cords.
4
v Connect all power cords to a properly wired and grounded electrical outlet. Ensure that the outlet
supplies proper voltage and phase rotation according to the system rating plate.
4
v Connect any equipment that will be attached to this product to properly wired outlets.
4
4
v When possible, use one hand only to connect or disconnect signal cables.
4
v Never turn on any equipment when there is evidence of fire, water, or structural damage.
v Disconnect the attached power cords, telecommunications systems, networks, and modems before
4
you open the device covers, unless instructed otherwise in the installation and configuration
4
4
procedures.
4
v Connect and disconnect cables as described in the following procedures when installing, moving,
or opening covers on this product or attached devices.
4
4 4
4
To disconnect:
4
4
1. Turn off everything (unless instructed otherwise).
4
4
2. Remove the power cords from the outlets.
4
4
3. Remove the signal cables from the connectors.
4
4
4. Remove all cables from the devices.
4
4
(D005)
4
4
4
Attention: If your system is powered on and performing I/O operations, go the management GUI and
4
follow the fix procedures. Performing the replacement actions without the assistance of the fix procedures
can result in loss of data or access to data.
4
Even though many of these procedures are hot-swappable, these procedures are intended to be used only
4
when your system is not up and running and performing I/O operations. Unless your system is offline,
4
4
go to the management GUI and follow the fix procedures.
Be careful when you are replacing the hardware components that are located in the back of the system
4
4
that you do not inadvertently disturb or remove any cables that you are not instructed to remove.
Ensure that you are aware of the procedures for handling static-sensitive devices before you remove the
4
4
enclosure.
Note: If your system is online, replacing an expansion enclosure can cause one or more of your volumes
4
4
to go offline or your quorum disks to be inaccessible. Before you proceed with these procedures, verify
which volumes might go offline. From the management GUI, go to Home → Manage Devices. Select the
4
enclosure that you want to replace. Then select Show Dependent Volumes in the Actions menu.
4
108
Storwize V7000 Version 6.1.0: Troubleshooting, Recovery, and Maintenance Guide
To connect:
1. Turn off everything (unless instructed otherwise).
2. Attach all cables to the devices.
3. Attach the signal cables to the connectors.
4. Attach the power cords to the outlets.
5. Turn on the devices.

Advertisement

Table of Contents
loading

Table of Contents