Tightening Torques, Control Cables; Electrical Installation, Control Terminals; Relay Connection; Vlt Software Dialog - Danfoss VT2800 Series Design Manual

Table of Contents

Advertisement

Tightening torques, control cables

Control wires must be connected with a tightening
torque of 0.22-0.25 Nm.

Electrical installation, control terminals

See section entitled Earthing of screened/armoured
control cables in the Design Guide for the correct
termination of control cables.
No.
Function
01-03
Relay outputs 01-03 can be used for
indicating status and alarms/warnings.
12
24 V DC voltage supply.
18-33
Digital inputs.
20, 55
Common frame for input
and output terminals.
42
Analog output for displaying frequency,
reference, current or torque.
1
46
Digital output for displaying status,
warnings or alarms, as well as
frequency output.
50
+10 V DC supply
voltage for potentiometer or thermistor.
53
Analogue voltage input 0 - 10 V DC.
60
Analogue current input 0/4 - 20 mA.
1
67
+ 5 V DC supply voltage
to Profibus.
68,
RS 485, Serial communication.
1
69
1
70
Frame for terminals 67, 68 and 69.
Normally this terminal is not to be used.
1. The terminals are not valid for DeviceNet. See the
DeviceNet manual, MG.90.BX.YY for further details.

Relay connection

See parameter 323 Relay output for programming
of relay output.
Nr. 01
- 02
1 - 2 make (normally open)
01
- 03
1 - 3 break (normally closed)
MG.28.E9.02 - VLT is a registered Danfoss trademark
®
VLT
2800 Series
NB!:
Please note that the cable jacket for the
relay must cover the first row of control
card terminals - otherwise the galvanic
isolation (PELV) cannot be maintained. Max. cable
diameter: 4 mm. See drawing.
Switches 1-4
The dip switch is only on the control card with
Profibus DP communication.
The switch position shown is the factory setting.
Switches 1 and 2 are used as cable termination for the
RS 485 interface. If the frequency converter is located
as the first or last unit in the bus system, switches
1 and 2 must be ON. On the remaining frequency
converters, switches 1 and 2 must be OFF.
Switches 3 and 4 are not applied.

VLT Software Dialog

Connection to terminals 68-70 or
Sub D:
- PIN 3 GND
- PIN 8 P-RS 485
- PIN 9 N-RS 485
Sub D plug
An LCP 2 control unit can be connected to the Sub D
plug on the control card. Ordering number: 175N0131.
LCP control unit with ordering number 175Z0401
is not to be connected.
55