Mounting The Svi Ii Esd On Reciprocating Valves; Magnet Holder For Reciprocating Valves; Reciprocating Valve Mounting Bracket - GE Masoneilan SVI II ESD Installation And Maintenance Manual

Smart valve interface with sil3 emergency shutdown pst controller
Table of Contents

Advertisement

Mounting the SVI II ESD on Reciprocating Valves

The process of mounting the SVI II ESD on a reciprocating valve consists of mounting the unit
on the actuator that is attached to the valve. This section describes the procedure for
mounting the SVI II ESD on Reciprocating Valves (using Masoneilan's 87⁄88 Multi-Spring
actuators as an example).
Mounting the SVI II ESD on a Reciprocating Actuator
Tools required:
7⁄16" Combination Wrench (2 required)
3⁄8" Combination Wrench
1⁄2" Combination Wrench
Phillips Head Screw Driver
5 mm Hex Key Wrench
1. Ensure that the lever is pinned to the magnet assembly and held securely by an M5 flat
head screw to ensure that the magnet axis is vertical when the lever is in the valve closed
position. Tighten the lever screw securely. Refer to Figure 45.
2. Mount the SVI II ESD reciprocating mounting bracket to the actuator using two (2) 5⁄16 - 18
UNC cap screws.The mounting location of the bracket depends on the size and stroke of
the actuator. Refer to Figure 46 and Figure 6 on page 68.
66 |
=GE Oil & Gas
M5 Flat head screw
Figure 45 Magnet Holder for Reciprocating Valves
Figure 46 Reciprocating Valve Mounting Bracket
Pin
© 2016 General Electric Company. All rights reserved.

Advertisement

Table of Contents
loading

Table of Contents