Mitsubishi Electric GOT2000 Series User Manual page 122

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■5. MELSECNET/H connection (PLC to PLC network) connection
(1) Coaxial cable
Step 1.
Strip off the sheath at both ends of the cable as shown in the figure below to expose outer braided shield
for grounding.
The braided shield sections are used for grounding with a cable clamp.
Step 2.
Install a ferrite core to the cable in the positions as shown in the figure below.
GOT side
130 or less
(5.12)
230 or less
(9.06)
(2) Fiber-optic cable
Fabricating a cable is not required.
■6. CC-Link IE Field Network connection
Step 1.
Strip off the sheath at both ends of the cable as shown in the figure below to expose braided shield for
grounding.
The braided shield sections are used for grounding with a cable clamp.
Step 2.
Install a ferrite core to the cable in the positions as shown in the figure below.
GOT side
120
or less
(4.72)
230 or less
(9.06)
5 - 14
5.2 EMC Directive Requirements
5.2.6 Grounding a cable
Ferrite core
(ZCAT3035-1330)
40
(1.57)
5.2.6 Grounding a cable
Ferrite core (ZCAT3035-1330)
40
(1.57)
PLC side
130 or less
(5.12)
40
400 or less
(1.57)
(15.75)
Controller side
40
400 or less
(1.57)
(15.75)
Unit: mm (inch)
Unit: mm (inch)