Verifying The Msm765Zl Is Installed Correctly - HP ProCurve MSM765zl Installation And Getting Started Manual

Mobility controller
Hide thumbs Also See for ProCurve MSM765zl:
Table of Contents

Advertisement

Hardware Installation
Installing the MSM765zl
N o t e
1-4

Verifying the MSM765zl is Installed Correctly

When the MSM765zl is installed properly, it undergoes a self test that takes a
few seconds. This happens both when the switch is powered on after installing
the MSM765zl, and when the MSM765zl is installed while the switch already
has power. The LEDs help determine if the MSM765zl has passed the self test,
as described in the following table.
LED
Location
of LED
Test
Switch
Fault
Switch
Module
Switch
Status
Module
MSM765zl
Status
HDD and CF
MSM765zl
Status
Error Conditions
Error conditions indicated by the MSM765zl LEDs are described in
Panel Port and LEDs" on page
Allow sufficient time for the MSM765zl to start up, or you will receive an error
message.
Display for a Properly Installed MSM765zl
ON briefly while the MSM765zl is undergoing self test, then OFF.
Note: If the MSM765zl was installed with the switch powered off,
and then the switch was powered on, the Test LED will stay ON
for the duration of the switch self test.
Figure 6 on page C-4
and
Figure 7 on page C-4
of the Test, Fault, and MSM765zl Status LEDs on a 5400zl or 8212zl
series switch, respectively.
OFF
The LED goes ON as soon as the MSM765zl is installed and the
switch is powered on, and stays ON steadily.
The LED blinks green during initialization. Solid green means that
MSM765zl is operational.
Figure 1 on page 1-1
shows the location of all MSM765zl LEDs.
The LED goes ON when HDD/CF initialization was successful. It
is OFF by default.
C-1.
show the location
"Front

Advertisement

Table of Contents
loading

Table of Contents