Verifying The Controller Is Installed Correctly - HP MSM765 zl Installation Manual

Mobility controller
Hide thumbs Also See for MSM765 zl:
Table of Contents

Advertisement

Verifying the controller is installed correctly

When the controller is installed properly, it undergoes a self test that takes a few seconds. This
happens both when the switch is powered-on after installing the controller and when the controller
is installed while the switch already has power. The LEDs help determine if the controller has passed
the self test, as described in the following table.
LED
Test
Fault
Module Status
Module Status
HDD and CF Status
Error conditions
Error conditions indicated by the controller LEDs are described in
(page 4)
NOTE:
Allow sufficient time for the controller to start up, or you will receive an error message.
Location of LED
Display for a properly installed controller
Switch
On briefly while the controller is undergoing self test, then off.
Note: If the controller was installed with the switch powered off,
and then the switch was powered on, the Test LED will stay on for
the duration of the switch self test.
Figure 2 (page 5)
the Test, Fault, and controller Status LEDs on a 5400 zl or 8212
zl series switch, respectively.
Switch
Off
Switch
The LED goes on as soon as the controller is installed and the
switch is powered on, and stays on.
Controller
The LED blinks green during initialization. On green means that
controller is operational.
"Controller front panel" (page 4)
controller LEDs.
Controller
The LED goes on when HDD/CF initialization was successful. It is
off by default.
and
Figure 3 (page 5)
show the location of
shows the location of all
"Front panel port and LEDs"
Verifying the controller is installed correctly
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents