Seagull Models steen skybolt n250sb Assembly Manual page 22

15cc
Table of Contents

Advertisement

STEEN SKYBOLT
4) When you are sure that everything
is aligned correctly, mix up a generous
amount of 30 Minute Epoxy. Apply a thin
layer to the bottom of the vertical stabi-
lizer mounting area. Apply epoxy to the
filler blocks. Set the vertical stabilizer as-
sembly in place. As you do this, install the
bottom rudder hinge into the fuselage
without any glue. Re-align the vertical
stabilizer carefully. Double check all of
your measurements once more before the
epoxy cures. Hold the stabilizer in place
with T-pins or masking tape, and remove
any excess epoxy using a paper towel and
rubbing alcohol. Allow the epoxy to fully
cure before proceeding. After the epoxy
is dry, glue the lower rudder hinge with
thin CA.
ELEVATOR PU SHROD HORN
INSTALLATION.
1) Locate items necessaryto install rud-
der pushrod.
2) Install the elevator control horn using
the same method as with the aileron con-
trol horns.
3) Position the elevator control horn on
the both side of elevator.
Elevator control horn.
22
Instruction Manual.
4) Thread one clevis and M2 lock nut on
to each elevator control rod. Thread the
horns on until they are flush with the
ends of the control rods.
5) Elevator and rudder pushrods assem-
bly as pictures below.
M2 clevis.
M2 lock nut.
Elevator pushrod.
M2 clevis.
Fuel tubing.
8mm
Cut.
Hex nut.

Advertisement

Table of Contents
loading

Table of Contents