Setup procedure
(1) As shown in the figure above, connect the output of the voltage generator to the GL200/A's CH1 input
terminal.
(2) Leave the GL200/A turned on for at least
(3) After entering the System Setup mode, open the Setup menu as shown below.
Specify the AMP Setup conditions as shown below.
Mode
CH
(4) Move the cursor to the "Execute Setup" position as shown below.
GL200-UM-251-9370
:Setup1 (Basic)
:CH 1
30
minutes.
4-6
4. SETUP PROCEDURES
Need help?
Do you have a question about the gl200 and is the answer not in the manual?
Questions and answers