Tail Landing Gear Installation - THRUSH S2R – G10 Maintenance Manual

Single cockpit and dual cockpit
Table of Contents

Advertisement

AIRCRAFT MAINTENANCE MANUAL
As a general rule, replace components
with holes that are out of round by
0.005" or more. Replacement of the
leaf
spring
forward
NAS6207-38D bolt (inspect every 100
hours) with a larger diameter is not
approved. The leaf spring may not be
"drilled out" for a larger bolt.
D. Inspect main spring leaf for corrosion
and
cracks.
maintenance records to be sure spring
leaf P/N 5079-1 has not exceeded its
five thousand (5,000) flight hour life
limit. Replace leaf spring as needed.
E. Inspect spindle housing assembly
welds for cracks.
F. Inspect spindle housing assembly for
cracks and corrosion.
G. Inspect lock pin and upper and lower
lock plates for wear, corrosion, cracks,
and proper operation.
H. Inspect centering springs for corrosion,
wear
at
ends,
operation.
I.
Inspect lock pin flexible cable and
spring
for
corrosion
operation.
J. Inspect P/N95207-1 Acetal (Delrin®)
lower support bracket spacer for wear
and cracks.
K. Inspect upper and lower leaf spring
support
brackets,
hardware for wear, corrosion, and
cracks.
Ensure that the leaf spring
support blocks grips the leaf spring
tightly to prevent leaf spring movement
fwd. and aft. Ensure flexible sealant
around contact edges of support
blocks, lower support block spacer and
leaf
spring
is
collection
of
material in this area. Lubricate 2 ea.
Trunnion Zerk (grease) fittings with
MIL-G-81322 (Aeroshell 22)
L. Repair of the tail landing gear is limited
to replacement of component parts
such
as
bearings
smoothing
out
scratches and repainting chipped or
Effective: 03/26/2010
THRUSH AIRCRAFT, INC – MODEL S2R-G10
attach
P/N
Check
aircraft
and
for
correct
and
correct
and
attachment
intact
to
prevent
potential
corrosive
&
bushings,
minor
nicks
and
peeled paint.

TAIL LANDING GEAR INSTALLATION

Ensure that trunnion is straight down (6
O'clock position) and that leaf spring
support blocks grips the leaf spring tightly
to prevent movement fwd. or aft. (Add or
subtract P/N 90056-26 washers/spacers
(.063") between upper and lower support
blocks to achieve a tight grip of leaf spring
after bolts are properly torqued.) All bolts
shanks and bolt holes are to be coated
with Snap-on™ General Purpose Anti-
seize
lubricant
or
installation.
Lubricate
bushings, and Zerk (grease) fittings with
MIL-G-81322
(Aeroshell
Torque all hardware in accordance with
TORQUE CHART (figure 2-7, Section 2)
with the exception of the top spindle
castellated
nut
and
castellated nut, which should be torqued
as follows:
A. For spindle castellated nut:
manually
rotating
spindle castellated nut to 20 inch-
pounds, continue rotating spindle and
back off to zero inch-pounds. While
manually rotating spindle, torque nut to
10 inch pounds.
position, advance nut to next position,
not to exceed 30º, and install cotter pin.
Bend ends of cotter pin around spindle
castellated nut. Note: Spindle must
rotate freely without perceptible play.
B. For tail wheel axle castellated nut:
While manually rotating wheel/tire,
torque axle castellated nut to 80 inch-
pounds, continue rotating wheel and
back off to zero inch-pounds. While
manually rotating wheel/tire, torque to
30 to 40-inch pounds. Rotate axle
castellated
nut
counterclockwise) to nearest slot and
cotter pin hole, and insert cotter pin.
Bend ends of cotter pin around axle
nut. Note: Wheel/tire must rotate freely
without perceptible play.
equivalent
before
all
bearings,
22)
grease.
wheel/tire
axle
While
spindle,
torque
If not in locking
(clockwise
or
6-13
Page

Advertisement

Table of Contents
loading

Table of Contents