Servicing Battery Installed In Aircraft; Generator System; Diagrams; Battery Operation - THRUSH S2R – G10 Maintenance Manual

Single cockpit and dual cockpit
Table of Contents

Advertisement

AIRCRAFT MAINTENANCE MANUAL
H. Charge battery until all cells are
gassing
freely
voltage
and
specific
electrolyte are constant over three
successive readings taken at one-
hour intervals. (This procedure may
take 18 - 24 hours with a constant
current charger.) During the period
of
charging,
temperatures shall be maintained
between 60F and 110F (15.6C
and 43.3C). Charge rate is 3 amps.
Reduce rate by 1/2 when cells start
gassing.
I.
When the battery is completely
charged, the specific gravity should
read between 1.285 and 1.295. At
this point, if electrolyte level needs to
be
adjusted,
electrolyte
to
recharge for one hour.
* NOTE *
For more detailed instructions,
see Gill Service Manual.
SERVICING BATTERY INSTALLED IN
AIRCRAFT
The 24-volt battery is installed aft of the
engine on the engine mount lower
longerons and is accessible through the
removable cowling skins.
battery
electrolyte
especially during hot weather. If a visual
check shows low cell level, add distilled
water to bring the cell(s) up to the proper
lever. (See battery servicing instructions)
1.285 - 1.295
1.275 - Less
10-4
Page
THRUSH AIRCRAFT, INC - MODEL S2R-G10
and
the
charge
gravity
of
the
electrolyte
remove
or
add
proper
level
and
Check the
level
frequently,
CHARGED
RECHARGE

GENERATOR SYSTEM

The
generator
system
generator; voltage regulator, reverse current
relay and circuit breaker (See electrical
diagrams). The generator is connected to
the circuit breaker bus and will supply the
current demands when output voltage
exceeds battery voltage

DIAGRAMS

The Electrical Diagrams of the Model S2R-
G10 aircraft is at the end of this section.

BATTERY OPERATION

Battery operation is controlled by a battery
switch, placarded BATT-ON-OFF, located
on the switch panel in the cockpit.
battery is capable of assuming the complete
electrical load for a limited time at 70 amps
max.
The batteries are located on the battery
plate assembly on the engine mount aft of
the engine.
They are installed with two-
battery hold down rods through the battery
cover. The battery case is vented overboard
to dispose of any electrolyte or hydrogen
gas
fumes
discharged
charging operation. Air enters the battery
compartment from an air scoop located in
the left cowl shin skin, circulates throughout
the battery compartment, and exists through
a vent in the battery and drains overboard
through a vent located on the belly skins.

BATTERY REMOVAL

A. Verify that the BATT-ON-OFF switch is
off. Disconnect external power.
B. Remove R.H. aft cowl skin.
C. Disconnect the battery and remove all
safety wire.
D. Disconnect vent tubes.
E. Remove nuts from battery hold down
rods
and
remove
compartment.
consists
of
a
The
during
normal
battery
from
Effective: 03/26/2010

Advertisement

Table of Contents
loading

Table of Contents