Vertical Stabilizer - THRUSH S2R – G10 Maintenance Manual

Single cockpit and dual cockpit
Table of Contents

Advertisement

AIRCRAFT MAINTENANCE MANUAL
D. Install left and right elevator using P/N
40065-1 spacer, AN4-12A bolt and
AN4-11A bolts in center and outboard
hinges. Connect elevator control arm

VERTICAL STABILIZER

A. Install forward attachment loosely
with NAS6207-68 bolt. Using either
no shims (normal) or, if a gap exist,
use one or more of the following P/N
21209T001
(.125")
21209T002 (.250") shim(s) at upper
attach and P/N 21208T001 (.125")
and/or
P/N
21208T002
shim(s) at lower attach.
hardware upper and lower and
navigation light ground wire (lower
attach);
tighten
hardware per torque table (See
Effective: 03/26/2010
THRUSH AIRCRAFT, INC – MODEL S2R-G10
Figure 7-10: Stabilizer Attachment to Fuselage
and/or
P/N
(250")
Install
all
vertical
fin
and check travel 27 ±1 up and
17±1 down.
E. Connect elevator trims tabs and check
for proper travel.
Figure 2-7). Using a string pulled tight
through upper rudder hinge and lower
rudder
hinge,
alignment fore, aft, left and right. It is
permissible to add (1) P/N 40207T005
(.050") or 40207T007 (.063") shim
between the center
housing and vertical fin rear spar to
achieve proper alignment.
check
hinges
for
hinge bearing
7-17
Page

Advertisement

Table of Contents
loading

Related Products for THRUSH S2R – G10

Table of Contents