Siemens Simantic ET200SP System Manual page 228

Table of Contents

Advertisement

Commissioning
10.11 Backing up and restoring the CPU configuration
The CPUs support archiving of multilingual project texts in up to three different project
languages. If the project texts belonging to a specific project language nevertheless exceed
the memory space reserved for them, it is not possible to load the project into the CPU. The
operation is canceled with a message indicating that not enough free storage space is
available. In such a case, take measures to reduce the required storage space, for example
by shortening comments.
Note
Size of the SIMATIC memory card
If the storage space needed to load projects exceeds the storage space available on the
SIMATIC memory card in use, loading into the CPU is canceled with an error message.
Therefore, make sure that there is enough available storage space on your SIMATIC
memory card for loading projects.
You will find information on reading out the storage space capacity utilization of the CPU and
the SIMATIC memory card in the Structure and use of the CPU memory
(https://support.industry.siemens.com/cs/de/de/view/59193101/en) function manual.
You will find information on parameterization of multilingual project texts in STEP 7 in the
STEP 7 online help.
228
Distributed I/O system
System Manual, 12/2016, A5E03576849-AG

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents