GE UR series Instruction Manual page 222

L60 line phase comparison system
Hide thumbs Also See for UR series:
Table of Contents

Advertisement

5.4 FLEXLOGIC™
Table 5–9: L60 FLEXLOGIC™ OPERANDS (Sheet 5 of 8)
OPERAND TYPE
OPERAND SYNTAX
ELEMENT:
PHASE OV1 PKP
Phase overvoltage
PHASE OV1 OP
PHASE OV1 DPO
PHASE OV1 PKP A
PHASE OV1 PKP B
PHASE OV1 PKP C
PHASE OV1 OP A
PHASE OV1 OP B
PHASE OV1 OP C
PHASE OV1 DPO A
PHASE OV1 DPO B
PHASE OV1 DPO C
ELEMENT
PHASE SELECT AG
Phase select
PHASE SELECT BG
PHASE SELECT CG
PHASE SELECT SLG
PHASE SELECT AB
PHASE SELECT BC
PHASE SELECT CA
PHASE SELECT ABG
PHASE SELECT BCG
PHASE SELECT CAG
PHASE SELECT 3P
PHASE SELECT MULTI-P
PHASE SELECT VOID
ELEMENT:
PHASE TOC1 PKP
Phase time
PHASE TOC1 OP
overcurrent
PHASE TOC1 DPO
PHASE TOC1 PKP A
PHASE TOC1 PKP B
5
PHASE TOC1 PKP C
PHASE TOC1 OP A
PHASE TOC1 OP B
PHASE TOC1 OP C
PHASE TOC1 DPO A
PHASE TOC1 DPO B
PHASE TOC1 DPO C
PHASE TOC2
ELEMENT:
PHASE UV1 PKP
Phase undervoltage
PHASE UV1 OP
PHASE UV1 DPO
PHASE UV1 PKP A
PHASE UV1 PKP B
PHASE UV1 PKP C
PHASE UV1 OP A
PHASE UV1 OP B
PHASE UV1 OP C
PHASE UV1 DPO A
PHASE UV1 DPO B
PHASE UV1 DPO C
PHASE UV2
ELEMENT:
POTT OP
POTT
POTT TX
(Permissive
overreach transfer
trip)
ELEMENT:
POWER SWING OUTER
Power swing detect
POWER SWING MIDDLE
POWER SWING INNER
POWER SWING BLOCK
POWER SWING TMR1 PKP
POWER SWING TMR2 PKP
POWER SWING TMR3 PKP
POWER SWING TMR4 PKP
POWER SWING TRIP
POWER SWING 50DD
POWER SWING INCOMING
POWER SWING OUTGOING
POWER SWING UN/BLOCK
5-90
OPERAND DESCRIPTION
At least one phase of overvoltage 1 has picked up
At least one phase of overvoltage 1 has operated
At least one phase of overvoltage 1 has dropped out
Phase A of overvoltage 1 has picked up
Phase B of overvoltage 1 has picked up
Phase C of overvoltage 1 has picked up
Phase A of overvoltage 1 has operated
Phase B of overvoltage 1 has operated
Phase C of overvoltage 1 has operated
Phase A of overvoltage 1 has dropped out
Phase B of overvoltage 1 has dropped out
Phase C of overvoltage 1 has dropped out
Phase A to ground fault is detected.
Phase B to ground fault is detected.
Phase C to ground fault is detected.
Single line to ground fault is detected.
Phase A to B fault is detected.
Phase B to C fault is detected.
Phase C to A fault is detected.
Phase A to B to ground fault is detected.
Phase B to C to ground fault is detected.
Phase C to A to ground fault is detected.
Three-phase symmetrical fault is detected.
Multi-phase fault is detected
Fault type cannot be detected
At least one phase of phase time overcurrent 1 has picked up
At least one phase of phase time overcurrent 1 has operated
All phases of phase time overcurrent 1 have dropped out
Phase A of phase time overcurrent 1 has picked up
Phase B of phase time overcurrent 1 has picked up
Phase C of phase time overcurrent 1 has picked up
Phase A of phase time overcurrent 1 has operated
Phase B of phase time overcurrent 1 has operated
Phase C of phase time overcurrent 1 has operated
Phase A of phase time overcurrent 1 has dropped out
Phase B of phase time overcurrent 1 has dropped out
Phase C of phase time overcurrent 1 has dropped out
Same set of operands as shown for PHASE TOC1
At least one phase of phase undervoltage 1 has picked up
At least one phase of phase undervoltage 1 has operated
At least one phase of phase undervoltage 1 has dropped out
Phase A of phase undervoltage 1 has picked up
Phase B of phase undervoltage 1 has picked up
Phase C of phase undervoltage 1 has picked up
Phase A of phase undervoltage 1 has operated
Phase B of phase undervoltage 1 has operated
Phase C of phase undervoltage 1 has operated
Phase A of phase undervoltage 1 has dropped out
Phase B of phase undervoltage 1 has dropped out
Phase C of phase undervoltage 1 has dropped out
Same set of operands as shown for PHASE UV1
Permissive over-reaching transfer trip has operated
Permissive signal sent
Positive-sequence impedance in outer characteristic
Positive-sequence impedance in middle characteristic
Positive-sequence impedance in inner characteristic
Power swing blocking element operated
Power swing timer 1 picked up
Power swing timer 2 picked up
Power swing timer 3 picked up
Power swing timer 4 picked up
Out-of-step tripping operated
The power swing element detected a disturbance other than power swing
An unstable power swing has been detected (incoming locus)
An unstable power swing has been detected (outgoing locus)
Asserted when a fault occurs after the power swing blocking condition has
been established
L60 Line Phase Comparison System
5 SETTINGS
GE Multilin

Advertisement

Table of Contents
loading

Table of Contents