Cabling And Setting Ip4Ww-1Priu-C1; Figure 2-82 Connector Of 1Priu-C1 - NEC SL1100 Hardware Manual

Hide thumbs Also See for SL1100:
Table of Contents

Advertisement

SL1100
2.
Connect the cables from the NT1 Network Termination cable to the J2 or J3 connector on the
2BRIDB-C1 daughter board.
Connector J2 - BRI1: Use switches J12, J13, J14
Connector J3 - BRI2: Use switches J15, J16, J17
Ensure that you set all switches correctly for each BRI circuit.

3.4.6 Cabling and Setting IP4WW-1PRIU-C1

This IP4WW-1PRIU-C1 PCB provides one RJ-45 PRI connection.
2-58
IP4WW-2BRIDB-C1
J12
J13 J14
J2
BRI 1
Figure 2-81 Switches Location of 2BRIDB-C1
J5
PRI 1
PRI/E1/T1 Line

Figure 2-82 Connector of 1PRIU-C1

J15
J16 J17
T
J3
J13/16
BRI 2
ISSUE 6.0
J12/15
ON OFF
S
T
S
J14/17
Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl1100

Table of Contents