Figure 2-61 Installation Of The Front Cover - NEC SL1100 Hardware Manual

Hide thumbs Also See for SL1100:
Table of Contents

Advertisement

ISSUE 6.0
10. Align tabs a to f to holes A to F on Battery Box. Slide the Front Cover into position and tighten the
two screws.
f
Front cover
Hardware Manual
d
b
e

Figure 2-61 Installation of the Front Cover

F
D
B
c
a
A
Two screws
(with stopper)
SL1100
E
C
2-41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl1100

Table of Contents